Work out how much fill dirt, granular, or backfill to order. Converts the compacted depth you need into the loose volume that shows up on the truck, so the load lands at grade instead of short. Use the Excavation Calculator if you are removing material from a dig site.
Work out how much fill dirt, granular, or backfill to order. Converts the compacted depth you need into the loose volume that shows up on the truck, so the load lands at grade instead of short. Use the Excavation Calculator if you are removing material from a dig site.
Volume is length × width × depth, with wastage and a compaction factor stacked on top.
cubic_feet = length × width × depth × (1 + wastage%) × (1 + compaction%)cubic_yards = cubic_feet ÷ 27Aggregate suppliers price by the cubic yard or by the ton; ask which.
Soil expands when excavated and shrinks when compacted, so set the compaction factor to match the haul or fill condition.
Both, depending on the supplier and material. Granular A is often priced per ton, topsoil per cubic yard. Always ask before ordering, and confirm whether delivery is included.
When you're bringing in fill that will be compacted in place. A positive compaction factor (e.g., +20%) means you need to order more loose material to end up with the target compacted volume.
Yes. The volume math is identical. Use the supplier's recommended compaction factor for that material; gravel typically settles 10–15%, sand a bit less.
Measure the area you are raising and the depth you want after compaction, then order enough loose material to land there. A 30 ft by 20 ft area raised 6 inches is 11.1 cubic yards compacted, and granular takes about a quarter more loose material than that, so the order is closer to 14 cubic yards. Screened fill dirt varies more than granular, so confirm the factor with your supplier.
No. This works out material you are bringing in. Cut and fill balances what you dig out against what you place, which is a different job; use the Excavation Calculator for the dig side and compare the two numbers yourself. It also has nothing to do with fill rate or fill factor, which are unrelated measurements that happen to share the word.
That depends on the material and how far it has to travel, so ask the pit for a delivered price rather than a pickup one. Put their number in the price field and the calculator applies it to the loose volume you are actually ordering, not the compacted volume you measured, which is the difference people miss when they budget.